Thursday, 1 December 2011

How filming went on the 1st December - Part of Performance

Tonight we filmed the first part of our performance side to our music video. We had our lead singer sitting on a sofa and we took various shots and different angles and he sang the whole song. We also got the lead singer to do some acting that matched the narrative and the lyrics, this made sure that it fitted in with everything else we have done and fulfilled the audiences needs.

We got Sam to sing the whole song a numerous amounts of times the whole through, this enabled us to achieve different shots but this will also make editing a lot easier for us and we will have more footage to be able to choose from. I believe this will improve our video as we can choose shots that are well framed, steady shot, and are good artistic shots.

Filming went well tonight, we ran over slightly our schedule but we managed to get all the shots done that we had on our story board, over all it went very well although we did have a limitation on the space we were using when shooting but i think we over came this and shot some good footage.

No comments:

Post a Comment