We used the social networking site Facebook to organise tomorrows filming -
Here is how tomorrows timings will run -
4.20 PM - Meet at Rob's house to load equipment into cars
5.00 PM - travel to the Studio
5.00 - 5.30 PM - set up all equipment and lighting
5.30 - 6.00 PM - do whole band shots, several times through
6.00 - 6.45 PM - Film individual shots of each instrument
In the studio we will be using studio lights so we will have a white back drop and bright lights that will contrast against the band members and instruments, making them standing out further.

No comments:
Post a Comment